Cut Fleet Costs.
Run for 10 Years. Charge in 30 Minutes.

Commercial Micro-EV platform built for high-load European delivery grids and financed through flexible operational leasing.

30 min

Type 2 charging turnaround

3,000+

LFP battery cycles

100% EU

Data sovereignty & telematics

Cut Fleet Costs.
Run for 10 Years. Charge in 30 Minutes.

Commercial Micro-EV platform built for high-load European delivery grids and financed through flexible operational leasing.

30 min

Type 2 charging turnaround

3,000+

LFP battery cycles

100% EU

Data sovereignty & telematics

Shift from CapEx to Predictable OpEx.

10-Year Lifecycle

No need to replace fleets every 3 years. Our platform engineered with 3,000 to 5,000 LFP battery cycles to outlast the chassis.

Institutional Leasing

We structure flexible operational leasing contracts covering the vehicle, API access, and maintenance SLA in one flat monthly fee.

Cobalt-Free ESG

Zero toxic cobalt or nickel. Fully ready for EU Battery Passport mandates to secure zero-emission municipal tenders.

Eternal Battery

24S LFP architecture with 3,000+ cycles. Fire-safe & built to outlast the chassis.

Eternal Battery

24S LFP architecture with 3,000+ cycles. Fire-safe & built to outlast the chassis.

Eternal Battery

24S LFP architecture with 3,000+ cycles. Fire-safe & built to outlast the chassis.

Meet PEM Monolith

The first Micro EV designed for maximum uptime and absolute autonomy.

Meet PEM Monolith

The first Micro EV designed for maximum uptime and absolute autonomy.

Meet PEM Monolith

The first Micro EV designed for maximum uptime and absolute autonomy.

Type 2 Integration

0-100% charge in 30 min at any public Type 2 (7kW AC Charging Station).

Type 2 Integration

0-100% charge in 30 min at any public Type 2 (7kW AC Charging Station).

Type 2 Integration

0-100% charge in 30 min at any public Type 2 (7kW AC Charging Station).

Multi-Source Charging

Supports V2V (Vehicle-to-Vehicle) and field charging from generators.

Multi-Source Charging

Supports V2V (Vehicle-to-Vehicle) and field charging from generators.

Multi-Source Charging

Supports V2V (Vehicle-to-Vehicle) and field charging from generators.

Wall Socket Support

Full charge in 58 minutes via standard 3.5 kW outlet.

Wall Socket Support

Full charge in 58 minutes via standard 3.5 kW outlet.

Wall Socket Support

Full charge in 58 minutes via standard 3.5 kW outlet.

Bridging the Gap Between Cheap and Unaffordable.

Bridging the gap between cheap and unaffordable

Criteria

Criteria

Asian Imports

Asian Imports

PEM Monolith

PEM Monolith

Cargo E-Bikes

Cargo E-Bikes

Charging

Charging

6-8h

4-8h (removable)

30 min (Type 2)

30 min

(Type 2)

4-6h

4-8h (removable)

Lifecycle

Lifecycle

2-3 Years (NMC)

2-3 Years (NMC)

10+ Years (LFP)

10+ Years (LFP)

2-3 Years

2-3 Years

Data Compliance

Data Compliance

High Risk

Non-EU Routing (High Risk)

100% EU Servers

100% EU Servers

None

None

Fire Safety

Fire safety

& overhead

Indoor Swapping Risk

High Risk

Zero Risk

Minimal Risk

Medium

Medium Risk

[API & DATA COMPLIANCE]

Built for Your Software.
Compliant with EU Laws.

Total control in your pocket.

Total control in your pocket.

Push real-time battery diagnostics

& GPS data directly into ERP via our Open API

Guarantee 100% EU Data Sovereignty with localized encrypted servers

Fully compliant with the EU Cyber Security Act and NIS 2 directives.

See how it works

3 Steps to Risk-Free Fleet Deployment:

3 Steps to Risk-Free Fleet Deployment:

01.TCO Audit

Submit your fleet metrics; we calculate exact operational savings.

02.ERP Integration

Connect our Vehicle Control Unit telemetry directly into your routing software before hardware arrives.

03.Live Operations

Secure priority units for a high-load test batch in your city with a full local maintenance SLA.

Request a Fleet TCO Audit

NIP: 1133182578

Pearl Electric Motors 2026

Follow us

NIP: 1133182578

Pearl Electric Motors 2026

Follow us

NIP: 1133182578

Pearl Electric Motors 2026

Follow us